INTRODUCTION
This approach is based on probability of survival after certain compartment or group of compartments are damaged.Attained index is a measure of ship's safety after damage or Collision.Probabilistic damage approach is complete measure of ship's stability and therefore any deterministic approach is not required after accessing this method.However passenger ships's have some minor criteria for deterministic damage which would insure safe arrangement of transverse bulkheads and forward area.
Two ships's with same index are assumed to have same level of safety for damage or collision,irrespective of location of damage
The effect of a three-dimensional damage to a ship with given watertight subdivision depends on the following circumstances:
Probability of survival is calculated as sum of probability of damage of a space or group spaces multiplied by probabilities of survival after corresponding space damage.
Probability of survival after damage in particular longitudinal position will depend on following probabilities
The first three of these factors are solely dependent on the watertight arrangement of the ship, while the last two depend on the ship’s shape. The last factor also depends on the actual loading condition. By grouping these probabilities, calculation of the probability of survival, or attained index A, have been formulated to include the following probabilities:
Ship size, number of passengers or other factors are important in calculation of required subdivision index R,which is defined minimum value for probabilistic stability.
i i A = Σp s
Subscript “i” represents the damage zone (group of compartments) under consideration within the watertight subdivision of the ship. The subdivision is viewed in the longitudinal direction,starting with the aftmost zone/compartment.
The value of “pi” represents the probability that only the zone “i” under consideration will be flooded, disregarding any horizontal subdivision, but taking transverse subdivision into account. Longitudinal subdivision within the zone will result in additional flooding scenarios, each with their own probability of occurrence.
The value of “si” represents the probability of survival after flooding the zone “i” under consideration.
Subdivision length (Ls) – Different examples of Ls showing the buoyant hull and the reserve buoyancy are provided in the figures below. The limiting deck for the reserve buoyancy may be partially watertight.
The maximum possible vertical extent of damage above the baseline is ds + 12.5 metres.
Freeboard deck – See notes under regulation 13-1 for the treatment of a stepped freeboard deck with regard to watertightness and construction requirements.
Light service draught (dl) – The light service draught (dl) represents the lower draught limit of the minimum required GM (or maximum allowable KG) curve. It corresponds, in general, to the ballast arrival condition with 10% consumables for cargo ships.
For passenger ships, it corresponds, in general, to the arrival condition with 10% consumables, a full complement of passengers and crew and their effects, and ballast as necessary for stability and trim. The 10% arrival condition is not necessarily the specific condition that must be used for all ships, but represents, in general, a suitable lower limit for all loading conditions. This is understood to not include docking conditions or other non-voyage conditions.
Stability information to be supplied to the master
MAXIMUM KG OR MINIMUM GM CURVE
Linear interpolation of the limiting values between the draughts ds, dp and dl is only applicable to minimum GM values. If it is intended to develop curves of maximum permissible KG, a sufficient number of KMT values for intermediate draughts must be calculated to ensure that the resulting maximum KG curves correspond with a linear variation of GM. When light service draught is not with the same trim as other draughts, KMT for draughts between partial and light service draught must be calculated for trims interpolated between trim at partial draught and trim at light service draught.
OPERATIONAL TRIM
In cases where the operational trim range is intended to exceed ±0.5% of Ls, the original GM limit line should be designed in the usual manner with the deepest subdivision draught and partial subdivision draught calculated at level trim and actual service trim used for the light service draught.
Then additional sets of GM limit lines should be constructed on the basis of the operational range of trims which is covered by loading conditions of partial subdivision draught and deepest subdivision draught ensuring that intervals of 1% Ls are not exceeded. For the light service draught dl only one trim is to be considered. The sets of GM limit lines are combined to give one envelope limiting GM curve. The effective trim range of the curve should be clearly stated.
REQUIRED SUBDIVISION INDEX R
To demonstrate compliance with these provisions, see the Guidelines for the preparation of subdivision and damage stability calculations, set out in the appendix, regarding the presentation of damage stability calculation results.
Regarding the term “reduced degree of hazard”, the following interpretation should be applied:
A lesser value of N, but in no case less than N = N1 + N2, may be allowed at the discretion of the Administration for passenger ships, which, in the course of their voyages, do not proceed more than 20 miles from the nearest land.
The probability of surviving after collision damage to the ship hull is expressed by the index A. Producing an index A requires calculation of various damage scenarios defined by the extent of damage and the initial loading conditions of the ship before damage. Three loading conditions should be considered and the result weighted as follows:
A = 0.4As + 0.4Ap + 0.2Al
where the indices s, p and l represent the three loading conditions and the factor to be multiplied to the index indicates how the index A from each loading condition is weighted.The method of calculating the A for a loading condition is expressed by the formula:
i=t
Ac = Σ pi [vi si]
i=1
The index c represents one of the three loading conditions, index i represents each investigated damage or group of damages and t is the number of damages to be investigated to calculate Ac for the particular loading condition. To obtain a maximum index A for a given subdivision, t has to be equal to T, the total number of damages.
In practice, the damage combinations to be considered are limited either by significantly reduced contributions to A (i.e. flooding of substantially larger volumes) or by exceeding the maximum possible damage length.
The index A is divided into partial factors as follows:
pi The p factor is solely dependent on the geometry of the watertight arrangement of the ship.
vi The v factor is dependent on the geometry of the watertight arrangement (decks) of the ship and the draught of the initial loading condition. It represents the probability that the spaces above the horizontal subdivision will not be flooded.
si The s factor is dependent on the calculated survivability of the ship after the considered damage for a specific initial condition.
Three initial loading conditions should be used for calculating the index A. The loading conditions are defined by their mean draught d, trim and GM (or KG).
HOW TO ACHIEVE TARGET INDEX BY VARYING MAX KG
The GM (or KG) values for the three loading conditions could, as a first attempt, be taken from the intact stability GM (or KG) limit curve. If the required index R is not obtained, the GM (or KG) values may be increased (or reduced), implying that the intact loading conditions from the intact stability book must now meet the GM (or KG) limit curve from the damage stability
calculations derived by linear interpolation between the three GMs.
The calculations for differing trim should be carried out with the same initial trim for the partial and deepest subdivision draughts. For the light service draught, the actual service trim should be used.
Each combination of the index within the formula given in regulation 7.1 should not be less than the requirement given in regulation 6.2. Each partial index A should comply with the requirements of regulation 6.1.
Example:
Based on the GM limiting curves obtained from damage stability calculations of each trim, an envelope curve covering all calculated trim values should be developed.Calculations covering different trim values should be carried out in steps not
exceeding 1% of Ls. The whole range including intermediate trims should be covered by the damage stability calculations. Refer to the example showing an envelope curve obtained from calculations of 0 trim and 1% of Ls.
EXTENT OF PENETRATION
With the same intent as wing tanks, the summation of the attained index A must reflect effects caused by all watertight bulkheads and flooding boundaries within the damaged zone. It is not correct to assume damage only to the centreline and ignore changes in subdivision that would reflect lesser contributions.
In the forward and aft ends of the ship where the sectional breadth is less than the ship’s breadth B,transverse damage penetration can extend beyond the centreline bulkhead. This application of the transverse extent of damage is consistent with the methodology to account for the localized statistics which are normalized on the greatest moulded breadth B rather than the local breadth.
CORRUGATED BULKHEAD
Where longitudinal corrugated bulkheads are fitted in wing compartments or on the centreline,they may be treated as equivalent plane bulkheads provided the corrugation depth is of the same order as the stiffening structure. The same principle may also be applied to transverse corrugated bulkheads.
PIPES AND VALVES
Pipes and valves directly adjacent to a bulkhead or to a deck can be considered to be part of the bulkhead or deck, provided the separation distance is of the same order as the bulkhead or deck stiffening structure. The same applies for small recesses, drain wells, etc.
The provision for allowing “minor progressive flooding” should be limited to pipes penetrating a watertight subdivision with a total cross-sectional area of not more than 710 mm2 between any two watertight compartments.
CALCULATION OF THE FACTOR Pi
The definitions below are intended to be used for the application of part B-1 only.
In regulation 7-1, the words “compartment” and “group of compartments” should be understood to mean “zone” and “adjacent zones”.
Zone – a longitudinal interval of the ship within the subdivision length.
Room – a part of the ship, limited by bulkheads and decks, having a specific permeability.
Space – a combination of rooms.
Compartment – an onboard space within watertight boundaries.
Damage – the three dimensional extent of the breach in the ship.
For the calculation of p, v, r and b only the damage should be considered, for the calculation of the s-value the flooded space should be considered. The figures below illustrate the difference.
Damage shown as the bold square:
The coefficients b11, b12, b21 and b22 are coefficients in the bi-linear probability density function on normalized damage length (J). The coefficient b12 is dependent on whether Ls is greater or less than L* (i.e. 260 m); the other coefficients are valid irrespective of Ls.
LONGITUDINAL SUBDIVISION
In order to prepare for the calculation of index A, the ship’s subdivision length Ls is divided into a fixed discrete number of damage zones. These damage zones will determine the damage stability investigation in the way of specific damages to be calculated.
There are no rules for the subdividing, except that the length Ls defines the extremes for the actual hull. Zone boundaries need not coincide with physical watertight boundaries. However, it is important to consider a strategy carefully to obtain a good result (that is a large attained index A). All zones and combination of adjacent zones may contribute to the index A. In general it is expected that the more zone boundaries the ship is divided into the higher will be the attained index, but this benefit must be balanced against extra computing time.
The figure above shows different longitudinal zone divisions of the length Ls.
The first example is a very rough division into three zones of approximately the same size with limits where longitudinal subdivision is established. The probability that the ship will survive a damage in one of the three zones is expected to be low (i.e. the s-factor is low or zero) and, therefore, the total attained index A will be correspondingly low. In the second example the zones have been placed in accordance with the watertight arrangement, including minor subdivision (as in double bottom, etc.). In this case there is a much better chance of obtaining higher s-factors. Where transverse corrugated bulkheads are fitted, they may be treated as equivalent plane bulkheads, provided the corrugation depth is of the same order as the stiffening structure.Pipes and valves directly adjacent to a transverse bulkhead can be considered to be part of the bulkhead, provided the separation distance is of the same order as the bulkhead stiffening structure. The same applies for small recesses, drain wells, etc.
For cases where the pipes and valves are outside the transverse bulkhead stiffening structure, when they present a risk of progressive flooding to other watertight compartments that will have influence on the overall attained index A, they should be handled either by introducing a new damage zone and accounting for the progressive flooding to associated compartments or by introducing a gap.
The triangle in the figure below illustrates the possible single and multiple zone damages in a ship with a watertight arrangement suitable for a seven-zone division. The triangles at the bottom line indicate single zone damages and the parallelograms indicate adjacent zones damages.
As an example, the triangle illustrates a damage opening the rooms in zone 2 to the sea and the parallelogram illustrates a damage where rooms in the zones 4, 5 and 6 are flooded simultaneously. The shaded area illustrates the effect of the maximum absolute damage length. The p-factor for acombination of three or more adjacent zones equals zero if the length of the combined adjacent damage zones minus the length of the foremost and the aft most damage zones in the combined
damage zone is greater than the maximum damage length. Having this in mind when subdividing Ls could limit the number of zones defined to maximize the attained index A.
As the p-factor is related to the watertight arrangement by the longitudinal limits of damage zones and the transverse distance from the ship side to any longitudinal barrier in the zone, the following indices are introduced:
Damage to the hull in a specific damage zone may just penetrate the ship’s watertight hull or penetrate further towards the centreline. To describe the probability of penetrating only a wing compartment, a probability factor r is used, based mainly on the penetration depth b. The value of r is equal to 1, if the penetration depth is B/2 where B is the maximum breadth of the ship at the deepest subdivision draught ds, and r = 0 if b = 0.
The penetration depth b is measured at level deepest subdivision draught ds as a transverse distance from the ship side right-angled to the centreline to a longitudinal barrier. Where the actual watertight bulkhead is not a plane parallel to the shell, b should be determined by means of an assumed line, dividing the zone to the shell in a relationship b1/b2
with 1 2 2 1 2 ≤ b b ≤ .
Examples of such assumed division lines are illustrated in the figure below. Each sketch represents a single damage zone at a water line plane level ds and the longitudinal bulkhead represents the outermost bulkhead position below ds + 12.5 m.
In calculating r-values for a group of two or more adjacent compartments, the b-value is common for all compartments in that group, and equal to the smallest b-value in that group:
b = min {b1, b2, …, bn}
where: n = number of wing compartments in that group;
b1, b2, …, bn = mean values of b for individual wing compartments contained in the group.
Accumulating p
The accumulated value of p for one zone or a group of adjacent zones is determined by:
k=Kj,n
pj,n = Σpj,n,k
k=1
j+n-1
where Kj,n = Σ Kj the total number of bk’s for the adjacent zones in question.
j
J J+1 J+n-1
bj,K
bj+1,1 bj+n-1,1 bj,2
bj,1
d waterline s
The figure above illustrates b’s for adjacent zones. The zone j has two penetration limits and one to the centre, the zone j+1 has one b and the zone j+n-1 has one value for b. The multiple zones will have (2+1+1) four values of b, and sorted in increasing order they are:
(bj,1 ; bj+1,1 ; bj+n-1,1 ; bj,2 ; bK)
Because of the expression for r(x1, x2, b) only one bK should be considered.To minimize the number of calculations, b’s of the same value may be deleted.
As bj,1 = bj+1,1 the final b’s will be (bj,1 ; bj+n-1,1 ; bj,2 ; bK)
Examples of multiple zones having a different b
Examples of combined damage zones and damage definitions are given in the figures below.
Compartments are identified by R10, R12, etc.
ds
j j+1 j+n-1
Figure: Combined damage of zones 1 + 2 + 3 includes a limited penetration to b3,taken into account generating two damages:
1) to b3 with R10, R20 and R31 damaged;
2) to B/2 with R10, R20, R31 and R32 damaged.
Figure: Combined damage of zones 1 + 2 + 3 includes 3 different limited damage
penetrations generating four damages:
1) to b3 with R11, R21 and R31 damaged;
2) to b2 with R11, R21, R31 and R32 damaged;
3) to b1 with R11, R21, R31, R32, and R22 damaged;
4) to B/2 with R11, R21, R31, R32, R22 and R12 damaged.
Figure: Combined damage of zone 1 + 2 + 3 including 2 different limited damage
penetrations (b1 < b2 = b3) generating three damages:
1) to b1 with R11, R21 and R31 damaged;
2) to b2 with R11, R21, R31 and R12, damaged;
3) to B/2 with R11, R21, R31, R12, R22 and R32 damaged.
A damage having a transverse extent b and a vertical extent H2 leads to the flooding of both wing
compartment and hold; for b and H1 only the wing compartment is flooded. The figure illustrates
a partial subdivision draught dp damage.
centreline
b2
= =
shell
Zone 1 Zone 2 Zone 3
R32
R31
R11
R12 R22
R21
= =
b1
b2
centreline
shell
Zone 1 Zone 2
= =
Zone 3
b3
R32
R31
R12 R22
R11
R21
b3
shell
centreline
Zone 1 Zone 2 Zone 3
R10 R20
R31
R32
b3
b3
b1
b1 b2 b3
SLF 51/WP.1
ANNEX 1
Page 22
I:\SLF\51\WP\1.doc
The same is valid if b-values are calculated for arrangements with sloped walls.Pipes and valves directly adjacent to a longitudinal bulkhead can be considered to be part of the bulkhead, provided the separation distance is of the same order as the bulkhead stiffening structure. The same applies for small recesses, drain wells, etc.
Regulation 7-2 – Calculation of the factor si
General
Initial condition – an intact loading condition to be considered in the damage analysis described by the mean draught, vertical centre of gravity and the trim. Or alternative parameters from where the same may be determined (ex. displacement, GM and trim). There are three initial conditions corresponding to the three draughts ds, dp and dl.
Immersion limits – immersion limits are an array of points that are not to be immersed at various stages of flooding as indicated in paragraphs 5.2 and 5.3 of the regulation.
Openings – all openings need to be defined: both weathertight and unprotected. Openings are the most critical factor to preventing an inaccurate index A. If the final waterline immerses the lower edge of any opening through which progressive flooding takes place, the factor “s” may be recalculated taking such flooding into account. However, in this case the s value should also be calculated without taking into account progressive flooding and corresponding opening. The smallest s value should be retained for the contribution to the attained index.
In cases where the GZ curve may include more than one “range” of positive righting levers for a specific stage of flooding, only one continuous positive “range” of the GZ curve may be used within the allowable range/heel limits for calculation purposes. Different stages of flooding may not be combined in a single GZ curve.
In figure 1, the s-factor may be calculated from the heel angle, range and corresponding GZmax of the first or second “range” of positive righting levers. In figure 2, only one s-factor can be calculated.
Intermediate stages of flooding
The case of instantaneous flooding in unrestricted spaces in way of the damage zone does not require intermediate stage flooding calculations. Where intermediate stages of flooding calculations are necessary in connection with progressive flooding, they should reflect the sequence of filling as well as filling level phases. Calculations for intermediate stages of flooding should be performed whenever equalization is not instantaneous, i.e. equalization is of a duration greater than 60 s. Such calculations consider the progress through one or more floodable (non-watertight) spaces. Bulkheads surrounding refrigerated spaces, incinerator rooms and longitudinal bulkheads fitted with non-watertight doors are typical examples of structures that may significantly slow down the equalization of main compartments.
Flooding boundaries
If a compartment contains decks, inner bulkheads, structural elements and doors of sufficient tightness and strength to seriously restrict the flow of water, for intermediate stage flooding calculation purposes it should be divided into corresponding non-watertight spaces. It is assumed that the non-watertight divisions considered in the calculations are limited to “A” class fire-rated bulkheads and do not apply to “B” class fire-rated bulkheads normally used in accommodation areas (e.g., cabins and corridors). This guidance also relates to regulation 4, paragraph 4.
Sequential flooding computation
For each damage scenario, the damage extent and location determine the initial stage of flooding. Calculations should be performed in stages, each stage comprising of at least two intermediate
filling phases in addition to the full phase per flooded space. Unrestricted spaces in way of damage should be considered as flooded immediately. Every subsequent stage involves all connected spaces being flooded simultaneously until an impermeable boundary or final equilibrium is reached. If due to the configuration of the subdivision in the ship it is expected
that other intermediate stages of flooding are more onerous, then those should be investigated.
Cross-flooding/equalization
In general, cross-flooding is meant as a flooding of an undamaged space on the other side of the ship to reduce the heel in the final equilibrium condition.
The cross-flooding time should be calculated in accordance with resolution MSC.245(83).If complete fluid equalization occurs in 60 s or less, it should be treated as instantaneous and no further calculations need to be carried out. Additionally, in cases where sfinal = 1 is achieved in 60 s or less, but equalization is not complete, instantaneous flooding may also be assumed
if sfinal will not become reduced. In any cases where complete fluid equalization exceeds 60 s, the value of sintermediate after 60 s is the first intermediate stage to be considered. Only passive open cross-flooding arrangements without valves should be considered effective for instantaneous flooding cases.
If complete fluid equalization can be finalized in 10 min or less, the assessment of survivability can be carried out for passenger ships as the smallest values of sintermediate or sfinal . In case the equalization time is longer than 10 min, sfinal is calculated for the floating position achieved after 10 min of equalization. This floating position is computed by calculating the
amount of flood water according to resolution MSC.245(83) using interpolation, where the equalization time is set to 10 min, i.e. the interpolation of the flood water volume is made between the case before equalization (T = 0) and the total calculated equalization time.
In any cases where complete fluid equalization exceeds 10 min, the value of sfinal used in theformula in paragraph 1.1 should be the minimum of sfinal at 10 min or at final equalization.
Cargo ships
If the Administration considers that the stability in intermediate stages of flooding in a cargo ship may be insufficient, it may require further investigation thereof.
The displacement is the intact displacement at the subdivision draught in question (ds, dp and dl).
The beam B used in this paragraph means breadth as defined in regulation 2.8.
The parameter A (projected lateral area) used in this paragraph does not refer to the attained subdivision index.
In cargo ships where cross flooding devices are fitted, the safety of the ship should be maintained in all stages of flooding. The Administration may request for this to be demonstrated. Cross-flooding equipment, if installed, should have the capacity to ensure that the equalization takes place within 10 min.
Unprotected openings
The flooding angle will be limited by immersion of such an opening. It is not necessary to define a criterion for non-immersion of unprotected openings at equilibrium, because if it is immersed, the range of positive GZ limited to flooding angle will be zero so “s” will be equal to zero.
An unprotected opening connects two rooms or one room and the outside. An unprotected opening will not be taken into account if the two connected rooms are flooded or none of these rooms are flooded. If the opening is connected to the outside, it will not be taken into account if the connected compartment is flooded. An unprotected opening does not need to be taken into account if it connects a flooded room or the outside to an undamaged room, if this room will be considered as flooded in a subsequent stage.
Openings fitted with a weathertight mean of closing (“weathertight openings”) The survival “s” factor will be “0” if any such point is submerged at a stage which is considered as “final”. Such points may be submerged during a stage or phase which is considered as“intermediate”, or within the range beyond equilibrium.
If an opening fitted with a weathertight means of closure is submerged at equilibrium during a stage considered as intermediate, it should be demonstrated that this weathertight means of closure can sustain the corresponding head of water and that the leakage rate is negligible.
These points are also defined as connecting two rooms or one room and the outside, and the same principle as for unprotected openings is applied to take them into account or not. If several stages have to be considered as “final”, a “weathertight opening” does not need to be taken into account if it connects a flooded room or the outside to an undamaged room if this room will be considered as flooded in a successive “final” stage.
Partial immersion of the bulkhead deck may be accepted at final equilibrium. The new provision is intended to ensure that evacuation along the bulkhead deck to the vertical escapes will not be impeded by water on that deck. A “horizontal evacuation route” in the context of this regulation means a route on the bulkhead deck connecting spaces located on and under this deck with the vertical escapes from the bulkhead deck required for compliance with SOLAS chapter II-2.
Horizontal evacuation routes on the bulkhead deck include only escape routes (designated as category 2 stairway spaces according to SOLAS regulation II-2/9.2.2.3 or as category 4 stairway spaces according to SOLAS regulation II-2/9.2.2.4 for passenger ships carrying not more than 36 passengers) used for the evacuation of undamaged spaces. Horizontal evacuation routes.
do not include corridors (designated as category 3 corridor spaces according to SOLAS regulation II-2/9.2.2.3 or as category 2 corridor spaces according to SOLAS regulation II-2/9.2.2.4 for passenger ships carrying not more than 36 passengers) within the damaged space. No part of a horizontal evacuation route serving undamaged spaces should be immersed.
si = 0 where it is not possible to access a stair leading up to the embarkation deck from an undamaged space as a result of flooding to the “stairway” or “horizontal stairway” on the
bulkhead deck.
Horizontal escapes situated in way of the damage extent may remain effective, therefore si need not be taken as zero. Contributions to the attained index A may still be gained.
The purpose of this paragraph is to provide an incentive to ensure that evacuation through a vertical escape will not be obstructed by water from above. The paragraph is intended for smaller emergency escapes, typically hatches, where fitting of a watertight or weathertight means of closure would otherwise exclude them from being considered as flooding points.
Since the probabilistic regulations do not require that the watertight bulkheads be carried continuously up to the bulkhead deck, care should be taken to ensure that evacuation from intact spaces through flooded spaces below the bulkhead deck will remain possible, for instance by means of a watertight trunk.
In this example, there are 3 horizontal subdivisions to be taken into account as the vertical extent of damage.The example shows the maximum possible vertical extent of damage d + 12.5 m is positioned between H2 and H3. H1 with factor v1, H2 with factor v2 > v1 but v2 < 1 and H3 with factor v3 = 1.
The factors v1 and v2 are the same as above. The reserve buoyancy above H3 should be taken undamaged in all damage cases.
The combination of damages into the rooms R1, R2 and R3 positioned below the initial water line should be chosen so that the damage with the lowest s-factor is taken into account. That often results in the definition of alternative damages to be calculated and compared.
If the deck taken as lower limit of damage is not watertight, down flooding should be considered.
The parameters x1 and x2 are the same as parameters x1 and x2 used in regulation 7-1.
Concerning the use of other figures for permeability “if substantiated by calculations”, such permeabilities should reflect the general conditions of the ship throughout its service life rather than specific loading conditions.
This paragraph allows for the recalculation of permeabilities. This should only be considered in cases where it is evident that there is a major discrepancy between the values shown in the regulation and the real values. It is not designed for improving the attained value of a deficient ship of regular type by the modification of chosen spaces in the ship that are known to provide
significantly onerous results. All proposals should be considered on a case-by-case basis by the Administration and should be justified with adequate calculations and arguments.
Regulation 8 – Special requirements concerning passenger ship stability
The number of persons carried, which is specified in these paragraphs, equals the total number of persons the ship is permitted to carry (and not N = N1 + 2 N2 as defined in regulation 6).
Regulation 8-1 – System capabilities after a flooding casualty on passenger ships
In the context of this regulation, “compartment” has the same meaning as defined under regulation 7-1 of these Explanatory Notes (i.e. an onboard space within watertight boundaries).The purpose of the paragraph is to prevent any flooding of limited extent from immobilizing the ship. This principle should be applied regardless of how the flooding might occur. Only
flooding below the bulkhead deck need be considered.
Regulation 9 – Double bottoms in passenger ships and cargo ships other than tankers
This regulation is intended to minimize the impact of flooding from a minor grounding. Special attention should be paid to the vulnerable area at the turn of the bilge. When justifying a deviation from fitting an inner bottom an assessment of the consequences of allowing a more extensive flooding than reflected in the regulation should be provided.
Except as provided in paragraphs 3 and 4, parts of the double bottom not extended for the full width of the ship as required by paragraph 1 should be considered an unusual arrangement for the purpose of this regulation and is to be handled in accordance with paragraph 7.
If an inner bottom is located higher than the partial subdivision draught dp, this should be considered an unusual arrangement and is to be handled in accordance with paragraph 7.
Any part of a passenger ship or a cargo ship where a double bottom is omitted in accordance with paragraph 1, 4 or 5 shall be capable of withstanding bottom damages, as specified in paragraph 8.
The intent of this provision is to specify the circumstances under which the Administration should require calculations, which damage extents to assume and what survival criteria to apply when double bottoms are not fitted.
The definition of “watertight” in regulation 2.17 implies that the strength of inner bottoms and other boundaries assumed to be watertight must be verified if they are to be considered effective in this context.
The reference to a “plane” in paragraph 2 does not imply that the surface of the inner bottom may not be stepped in the vertical direction. Minor steps and recesses need not be considered unusual arrangements for the purpose of this paragraph as long as no part of the inner bottom is located below the reference plane. Discontinuities in way of wing tanks are covered by paragraph 4.
The term “all service conditions” used in this paragraph means the three loading conditions used to calculate the attained subdivision index A.
The damage extents specified in this paragraph should be applied to all parts of the ship where no double bottom is fitted, as permitted by regulation 9.1, 9.4 or 9.5, and include any adjacent spaces located within the extent of damage. Small wells in accordance with regulation 9.3 do not need to be considered damaged even if within the extent of the damage. Possible positions of the damages are shown in an example below (parts of the ship not fitted with a double bottom are shaded; the damages to be assumed are indicated by boxes).
For the purpose of identifying “large lower holds”, horizontal surfaces having a continuous deck area greater than approximately 30% in comparison with the waterplane area at subdivision draught should be taken located anywhere in the affected area of the ship. For the alternative bottom damage calculation, a vertical extent of B/10 or 3 m, whichever is less, should be assumed.
The increased minimum double bottom height of not more than B/10 or 3 m, whichever is less, for passenger ships with large lower holds, is applicable to holds in direct contact with the double bottom. Typical arrangements of ro-ro passenger ships may include a large lower hold with additional tanks between the double bottom and the lower hold, as shown in the figure below.
In such cases, the vertical position of the double bottom required to be B/10 or 3 m, whichever is less, should be applied to the lower hold deck, maintaining the required double bottom height of B/20 or 2 m, whichever is less (but not less than 760 mm).
Typical arrangement of a modern ro-ro passenger ferry
Regulation 10 – Construction of watertight bulkheads
For the treatment of steps in the bulkhead deck of passenger ships see notes under regulation 13.For the treatment of steps in the freeboard deck of cargo ships see notes under regulation 13-1.Regulation 12 – Peak and machinery space bulkheads, shaft tunnels, etc.Reference is made to MSC.1/Circ.1211 concerning interpretations regarding bow doors and the extension of the collision bulkhead.
Regulation 13 – Openings in watertight bulkheads below the bulkhead deck in passenger ships
General – Steps in the bulkhead deck
If the transverse watertight bulkheads in a region of the ship are carried to a higher deck which forms a vertical step in the bulkhead deck, openings located in the bulkhead at the step may be considered as being located above the bulkhead deck. Such openings should then comply with regulation 17 and should be taken into account when applying regulation 7-2.
All openings in the shell plating below the upper deck throughout that region of the ship should be treated as being below the bulkhead deck and the provisions of regulation 15 should be applied.
Paragraph 4
In cases where main and auxiliary propulsion machinery spaces, including boilers serving the needs for propulsion, are divided by watertight longitudinal bulkheads in order to comply with redundancy requirements (e.g., according to regulation 8-1.2), one watertight door in each watertight bulkhead may be permitted, as shown in the figure below.
Regulation 13-1 – Openings in watertight bulkheads and internal decks in cargo ships
Paragraph 1
If the transverse watertight bulkheads in a region of the ship are carried to a higher deck than in the remainder of the ship, openings located in the bulkhead at the step may be considered as being located above the freeboard deck.
All openings in the shell plating below the upper deck throughout that region of the ship should be treated as being below the freeboard deck, similar to the bulkhead deck for passenger ships (see relevant figure under regulation 13 above), and the provisions of regulation 15 should be applied.
Regulation 15 – Openings in the shell plating below the bulkhead deck of passenger ships and the freeboard deck of cargo ships
General – Steps in the bulkhead deck and freeboard deck
For the treatment of steps in the bulkhead deck of passenger ships see notes under regulation 13.
For the treatment of steps in the freeboard deck of cargo ships see notes under regulation 13-1.
Regulation 15-1 – External openings in cargo ships
Paragraph 1
With regard to air-pipe closing devices, they should be considered weathertight closing devices (not watertight). This is consistent with their treatment in regulation 7-2.5.2.1. However, in the context of regulation 15-1, “external openings” are not intended to include air-pipe openings.
Regulation 16 – Construction and initial tests of watertight doors, sidescuttles, etc.
Paragraph 2
Watertight doors should be tested by water pressure to a head of water measured from the lower edge of the door opening to the bulkhead deck or the freeboard deck, or to the most unfavourable final or intermediate waterplane during flooding, whichever is greater. Large doors, hatches or ramps on passenger and cargo ships, of a design and size that would make pressure testing impracticable, may be exempted from regulation 16.2, provided it is demonstrated by calculations that the doors, hatches or ramps maintain watertightness at design pressure with a proper margin of resistance. Where such doors utilize gasket seals, a prototype pressure test to confirm that the compression of the gasket material is capable of accommodating any deflection, revealed by the structural analysis, should be carried out. After installation every such door, hatch or ramp should be tested by means of a hose test or equivalent.
Note: See notes under regulation 13 for additional information regarding the treatment of steps in the bulkhead deck of passenger ships. See notes under regulation 13-1 for additional information regarding the treatment of steps in the freeboard deck of cargo ships.
Regulation 17 – Internal watertight integrity of passenger ships above the bulkhead deck
General – Steps in the bulkhead deck
For the treatment of steps in the bulkhead deck of passenger ships see notes under regulation 13.
Paragraph 1
Watertight sliding doors with reduced pressure head complying with the requirements of MSC/Circ.541, as may be amended, should be in line with regulation 7-2.5.2.1. These types of tested watertight sliding doors with reduced pressure head could be immersed during intermediate stages of flooding.
Paragraph 3
These provisions regarding the open end of air pipes should be applied only to damages of longitudinal and transverse extent as defined in regulation 8.3 but limited to the bulkhead deck and involving tanks having their open end terminating within the superstructure.
GUIDELINES FOR THE PREPARATION OF SUBDIVISION AND DAMAGE STABILITY CALCULATIONS
1 GENERAL
1.1 Purpose of the Guidelines
1.1.1 These Guidelines serve the purpose of simplifying the process of the damage stability analysis, as experience has shown that a systematic and complete presentation of the particulars results in considerable saving of time during the approval process.
1.1.2 A damage stability analysis serves the purpose to provide proof of the damage stability standard required for the respective ship type. At present, two different calculation methods, the deterministic concept and the probabilistic concept are applied.
1.2 Scope of analysis and documentation on board
1.2.1 The scope of subdivision and damage stability analysis is determined by the required damage stability standard and aims at providing the ship’s master with clear intact stability requirements. In general, this is achieved by determining KG-respective GM-limit curves,containing the admissible stability values for the draught range to be covered.
1.2.2 Within the scope of the analysis thus defined, all potential or necessary damage conditions will be determined, taking into account the damage stability criteria, in order to obtain the required damage stability standard. Depending on the type and size of ship, this may involve a considerable amount of analyses.
1.2.3 Referring to SOLAS chapter II-1, regulation 19, the necessity to provide the crew withthe relevant information regarding the subdivision of the ship is expressed, therefore plans should be provided and permanently exhibited for the guidance of the officer in charge. These plans should clearly show for each deck and hold the boundaries of the watertight compartments, the openings therein with means of closure and position of any controls thereof, and the arrangements for the correction of any list due to flooding. In addition, Damage Control Booklets containing the aforementioned information should be available.
2 DOCUMENTS FOR SUBMISSION
2.1 Presentation of documents
The documentation should begin with the following details: principal dimensions, ship type,designation of intact conditions, designation of damage conditions and pertinent damaged compartments, KG-respective GM-limit curve.
2.2 General documents
For checking of the input data, the following should be submitted:
.1 main dimensions;
.2 lines plan, plotted or numerically;
.3 hydrostatic data and cross curves of stability (including drawing of the buoyant hull);
.4 definition of sub-compartments with moulded volumes, centres of gravity and permeability;
.5 layout plan (watertight integrity plan) for the sub-compartments with all internal and external opening points including their connected sub-compartments, and particulars used in measuring the spaces, such as general arrangement plan and
tank plan. The subdivision limits, longitudinal, transverse and vertical, should be included;
.6 light service condition;
.7 load line draught;
.8 coordinates of opening points with their level of tightness (e.g., weathertight,unprotected);
.9 watertight door location with pressure calculation;
.10 side contour and wind profile;
.11 cross and down flooding devices and the calculations thereof according to resolution MSC.245(83) with information about diameter, valves, pipes length and coordinates of inlet/outlet;
.12 pipes in damaged area when the destruction of these pipes results in progressive flooding; and
.13 damage extensions and definition of damage cases.
2.3 Special documents
The following documentation of results should be submitted.
2.3.1 Documentation
2.3.1.1 Initial data:
.1 subdivision length Ls;
.2 initial draughts and the corresponding GM-values;
.3 required subdivision index R; and
.4 attained subdivision index A with a summary table for all contributions for all
damaged zones.
2.3.1.2 Results for each damage case which contributes to the index A:
.1 draught, trim, heel, GM in damaged condition;
.2 dimension of the damage with probabilistic values p, v and r;
.3 righting lever curve (including GZmax and range) with factor of survivability s;
.4 critical weathertight and unprotected openings with their angle of immersion; and
.5 details of sub-compartments with amount of in-flooded water/lost buoyancy with
their centres of gravity.
This approach is based on probability of survival after certain compartment or group of compartments are damaged.Attained index is a measure of ship's safety after damage or Collision.Probabilistic damage approach is complete measure of ship's stability and therefore any deterministic approach is not required after accessing this method.However passenger ships's have some minor criteria for deterministic damage which would insure safe arrangement of transverse bulkheads and forward area.
Two ships's with same index are assumed to have same level of safety for damage or collision,irrespective of location of damage
The effect of a three-dimensional damage to a ship with given watertight subdivision depends on the following circumstances:
- Compartment or group of compartments flooded
- Draft,trim and GM before damage
- Permiability of damaged spaces
Probability of survival is calculated as sum of probability of damage of a space or group spaces multiplied by probabilities of survival after corresponding space damage.
Probability of survival after damage in particular longitudinal position will depend on following probabilities
- Damage location is within ship
- Damage occurs between transverse bulkheads
- Damage occurs below a given horizontal boundary, such as a watertight deck
- the probability that the damage has a transverse penetration not greater than the distance to a given longitudinal boundary; and
- the probability that the watertight integrity and the stability throughout the flooding sequence is sufficient to avoid capsizing or sinking.
The first three of these factors are solely dependent on the watertight arrangement of the ship, while the last two depend on the ship’s shape. The last factor also depends on the actual loading condition. By grouping these probabilities, calculation of the probability of survival, or attained index A, have been formulated to include the following probabilities:
- Flooding of single compartment or a group of compartments
- Stability after these damages are within limit after loss of stability,excessive heel or flooding in intermediate stages of flooding
Ship size, number of passengers or other factors are important in calculation of required subdivision index R,which is defined minimum value for probabilistic stability.
i i A = Σp s
Subscript “i” represents the damage zone (group of compartments) under consideration within the watertight subdivision of the ship. The subdivision is viewed in the longitudinal direction,starting with the aftmost zone/compartment.
The value of “pi” represents the probability that only the zone “i” under consideration will be flooded, disregarding any horizontal subdivision, but taking transverse subdivision into account. Longitudinal subdivision within the zone will result in additional flooding scenarios, each with their own probability of occurrence.
The value of “si” represents the probability of survival after flooding the zone “i” under consideration.
Subdivision length (Ls) – Different examples of Ls showing the buoyant hull and the reserve buoyancy are provided in the figures below. The limiting deck for the reserve buoyancy may be partially watertight.
The maximum possible vertical extent of damage above the baseline is ds + 12.5 metres.
Freeboard deck – See notes under regulation 13-1 for the treatment of a stepped freeboard deck with regard to watertightness and construction requirements.
Light service draught (dl) – The light service draught (dl) represents the lower draught limit of the minimum required GM (or maximum allowable KG) curve. It corresponds, in general, to the ballast arrival condition with 10% consumables for cargo ships.
For passenger ships, it corresponds, in general, to the arrival condition with 10% consumables, a full complement of passengers and crew and their effects, and ballast as necessary for stability and trim. The 10% arrival condition is not necessarily the specific condition that must be used for all ships, but represents, in general, a suitable lower limit for all loading conditions. This is understood to not include docking conditions or other non-voyage conditions.
Stability information to be supplied to the master
MAXIMUM KG OR MINIMUM GM CURVE
Linear interpolation of the limiting values between the draughts ds, dp and dl is only applicable to minimum GM values. If it is intended to develop curves of maximum permissible KG, a sufficient number of KMT values for intermediate draughts must be calculated to ensure that the resulting maximum KG curves correspond with a linear variation of GM. When light service draught is not with the same trim as other draughts, KMT for draughts between partial and light service draught must be calculated for trims interpolated between trim at partial draught and trim at light service draught.
OPERATIONAL TRIM
In cases where the operational trim range is intended to exceed ±0.5% of Ls, the original GM limit line should be designed in the usual manner with the deepest subdivision draught and partial subdivision draught calculated at level trim and actual service trim used for the light service draught.
Then additional sets of GM limit lines should be constructed on the basis of the operational range of trims which is covered by loading conditions of partial subdivision draught and deepest subdivision draught ensuring that intervals of 1% Ls are not exceeded. For the light service draught dl only one trim is to be considered. The sets of GM limit lines are combined to give one envelope limiting GM curve. The effective trim range of the curve should be clearly stated.
REQUIRED SUBDIVISION INDEX R
To demonstrate compliance with these provisions, see the Guidelines for the preparation of subdivision and damage stability calculations, set out in the appendix, regarding the presentation of damage stability calculation results.
Regarding the term “reduced degree of hazard”, the following interpretation should be applied:
A lesser value of N, but in no case less than N = N1 + N2, may be allowed at the discretion of the Administration for passenger ships, which, in the course of their voyages, do not proceed more than 20 miles from the nearest land.
The probability of surviving after collision damage to the ship hull is expressed by the index A. Producing an index A requires calculation of various damage scenarios defined by the extent of damage and the initial loading conditions of the ship before damage. Three loading conditions should be considered and the result weighted as follows:
A = 0.4As + 0.4Ap + 0.2Al
where the indices s, p and l represent the three loading conditions and the factor to be multiplied to the index indicates how the index A from each loading condition is weighted.The method of calculating the A for a loading condition is expressed by the formula:
i=t
Ac = Σ pi [vi si]
i=1
The index c represents one of the three loading conditions, index i represents each investigated damage or group of damages and t is the number of damages to be investigated to calculate Ac for the particular loading condition. To obtain a maximum index A for a given subdivision, t has to be equal to T, the total number of damages.
In practice, the damage combinations to be considered are limited either by significantly reduced contributions to A (i.e. flooding of substantially larger volumes) or by exceeding the maximum possible damage length.
The index A is divided into partial factors as follows:
pi The p factor is solely dependent on the geometry of the watertight arrangement of the ship.
vi The v factor is dependent on the geometry of the watertight arrangement (decks) of the ship and the draught of the initial loading condition. It represents the probability that the spaces above the horizontal subdivision will not be flooded.
si The s factor is dependent on the calculated survivability of the ship after the considered damage for a specific initial condition.
Three initial loading conditions should be used for calculating the index A. The loading conditions are defined by their mean draught d, trim and GM (or KG).
HOW TO ACHIEVE TARGET INDEX BY VARYING MAX KG
The GM (or KG) values for the three loading conditions could, as a first attempt, be taken from the intact stability GM (or KG) limit curve. If the required index R is not obtained, the GM (or KG) values may be increased (or reduced), implying that the intact loading conditions from the intact stability book must now meet the GM (or KG) limit curve from the damage stability
calculations derived by linear interpolation between the three GMs.
The calculations for differing trim should be carried out with the same initial trim for the partial and deepest subdivision draughts. For the light service draught, the actual service trim should be used.
Each combination of the index within the formula given in regulation 7.1 should not be less than the requirement given in regulation 6.2. Each partial index A should comply with the requirements of regulation 6.1.
Example:
Based on the GM limiting curves obtained from damage stability calculations of each trim, an envelope curve covering all calculated trim values should be developed.Calculations covering different trim values should be carried out in steps not
exceeding 1% of Ls. The whole range including intermediate trims should be covered by the damage stability calculations. Refer to the example showing an envelope curve obtained from calculations of 0 trim and 1% of Ls.
EXTENT OF PENETRATION
With the same intent as wing tanks, the summation of the attained index A must reflect effects caused by all watertight bulkheads and flooding boundaries within the damaged zone. It is not correct to assume damage only to the centreline and ignore changes in subdivision that would reflect lesser contributions.
In the forward and aft ends of the ship where the sectional breadth is less than the ship’s breadth B,transverse damage penetration can extend beyond the centreline bulkhead. This application of the transverse extent of damage is consistent with the methodology to account for the localized statistics which are normalized on the greatest moulded breadth B rather than the local breadth.
CORRUGATED BULKHEAD
Where longitudinal corrugated bulkheads are fitted in wing compartments or on the centreline,they may be treated as equivalent plane bulkheads provided the corrugation depth is of the same order as the stiffening structure. The same principle may also be applied to transverse corrugated bulkheads.
PIPES AND VALVES
Pipes and valves directly adjacent to a bulkhead or to a deck can be considered to be part of the bulkhead or deck, provided the separation distance is of the same order as the bulkhead or deck stiffening structure. The same applies for small recesses, drain wells, etc.
The provision for allowing “minor progressive flooding” should be limited to pipes penetrating a watertight subdivision with a total cross-sectional area of not more than 710 mm2 between any two watertight compartments.
CALCULATION OF THE FACTOR Pi
The definitions below are intended to be used for the application of part B-1 only.
In regulation 7-1, the words “compartment” and “group of compartments” should be understood to mean “zone” and “adjacent zones”.
Zone – a longitudinal interval of the ship within the subdivision length.
Room – a part of the ship, limited by bulkheads and decks, having a specific permeability.
Space – a combination of rooms.
Compartment – an onboard space within watertight boundaries.
Damage – the three dimensional extent of the breach in the ship.
For the calculation of p, v, r and b only the damage should be considered, for the calculation of the s-value the flooded space should be considered. The figures below illustrate the difference.
Damage shown as the bold square:
The coefficients b11, b12, b21 and b22 are coefficients in the bi-linear probability density function on normalized damage length (J). The coefficient b12 is dependent on whether Ls is greater or less than L* (i.e. 260 m); the other coefficients are valid irrespective of Ls.
LONGITUDINAL SUBDIVISION
In order to prepare for the calculation of index A, the ship’s subdivision length Ls is divided into a fixed discrete number of damage zones. These damage zones will determine the damage stability investigation in the way of specific damages to be calculated.
There are no rules for the subdividing, except that the length Ls defines the extremes for the actual hull. Zone boundaries need not coincide with physical watertight boundaries. However, it is important to consider a strategy carefully to obtain a good result (that is a large attained index A). All zones and combination of adjacent zones may contribute to the index A. In general it is expected that the more zone boundaries the ship is divided into the higher will be the attained index, but this benefit must be balanced against extra computing time.
The figure above shows different longitudinal zone divisions of the length Ls.
The first example is a very rough division into three zones of approximately the same size with limits where longitudinal subdivision is established. The probability that the ship will survive a damage in one of the three zones is expected to be low (i.e. the s-factor is low or zero) and, therefore, the total attained index A will be correspondingly low. In the second example the zones have been placed in accordance with the watertight arrangement, including minor subdivision (as in double bottom, etc.). In this case there is a much better chance of obtaining higher s-factors. Where transverse corrugated bulkheads are fitted, they may be treated as equivalent plane bulkheads, provided the corrugation depth is of the same order as the stiffening structure.Pipes and valves directly adjacent to a transverse bulkhead can be considered to be part of the bulkhead, provided the separation distance is of the same order as the bulkhead stiffening structure. The same applies for small recesses, drain wells, etc.
For cases where the pipes and valves are outside the transverse bulkhead stiffening structure, when they present a risk of progressive flooding to other watertight compartments that will have influence on the overall attained index A, they should be handled either by introducing a new damage zone and accounting for the progressive flooding to associated compartments or by introducing a gap.
The triangle in the figure below illustrates the possible single and multiple zone damages in a ship with a watertight arrangement suitable for a seven-zone division. The triangles at the bottom line indicate single zone damages and the parallelograms indicate adjacent zones damages.
As an example, the triangle illustrates a damage opening the rooms in zone 2 to the sea and the parallelogram illustrates a damage where rooms in the zones 4, 5 and 6 are flooded simultaneously. The shaded area illustrates the effect of the maximum absolute damage length. The p-factor for acombination of three or more adjacent zones equals zero if the length of the combined adjacent damage zones minus the length of the foremost and the aft most damage zones in the combined
damage zone is greater than the maximum damage length. Having this in mind when subdividing Ls could limit the number of zones defined to maximize the attained index A.
As the p-factor is related to the watertight arrangement by the longitudinal limits of damage zones and the transverse distance from the ship side to any longitudinal barrier in the zone, the following indices are introduced:
Damage to the hull in a specific damage zone may just penetrate the ship’s watertight hull or penetrate further towards the centreline. To describe the probability of penetrating only a wing compartment, a probability factor r is used, based mainly on the penetration depth b. The value of r is equal to 1, if the penetration depth is B/2 where B is the maximum breadth of the ship at the deepest subdivision draught ds, and r = 0 if b = 0.
The penetration depth b is measured at level deepest subdivision draught ds as a transverse distance from the ship side right-angled to the centreline to a longitudinal barrier. Where the actual watertight bulkhead is not a plane parallel to the shell, b should be determined by means of an assumed line, dividing the zone to the shell in a relationship b1/b2
with 1 2 2 1 2 ≤ b b ≤ .
Examples of such assumed division lines are illustrated in the figure below. Each sketch represents a single damage zone at a water line plane level ds and the longitudinal bulkhead represents the outermost bulkhead position below ds + 12.5 m.
In calculating r-values for a group of two or more adjacent compartments, the b-value is common for all compartments in that group, and equal to the smallest b-value in that group:
b = min {b1, b2, …, bn}
where: n = number of wing compartments in that group;
b1, b2, …, bn = mean values of b for individual wing compartments contained in the group.
Accumulating p
The accumulated value of p for one zone or a group of adjacent zones is determined by:
k=Kj,n
pj,n = Σpj,n,k
k=1
j+n-1
where Kj,n = Σ Kj the total number of bk’s for the adjacent zones in question.
j
J J+1 J+n-1
bj,K
bj+1,1 bj+n-1,1 bj,2
bj,1
d waterline s
The figure above illustrates b’s for adjacent zones. The zone j has two penetration limits and one to the centre, the zone j+1 has one b and the zone j+n-1 has one value for b. The multiple zones will have (2+1+1) four values of b, and sorted in increasing order they are:
(bj,1 ; bj+1,1 ; bj+n-1,1 ; bj,2 ; bK)
Because of the expression for r(x1, x2, b) only one bK should be considered.To minimize the number of calculations, b’s of the same value may be deleted.
As bj,1 = bj+1,1 the final b’s will be (bj,1 ; bj+n-1,1 ; bj,2 ; bK)
Examples of multiple zones having a different b
Examples of combined damage zones and damage definitions are given in the figures below.
Compartments are identified by R10, R12, etc.
ds
j j+1 j+n-1
Figure: Combined damage of zones 1 + 2 + 3 includes a limited penetration to b3,taken into account generating two damages:
1) to b3 with R10, R20 and R31 damaged;
2) to B/2 with R10, R20, R31 and R32 damaged.
Figure: Combined damage of zones 1 + 2 + 3 includes 3 different limited damage
penetrations generating four damages:
1) to b3 with R11, R21 and R31 damaged;
2) to b2 with R11, R21, R31 and R32 damaged;
3) to b1 with R11, R21, R31, R32, and R22 damaged;
4) to B/2 with R11, R21, R31, R32, R22 and R12 damaged.
Figure: Combined damage of zone 1 + 2 + 3 including 2 different limited damage
penetrations (b1 < b2 = b3) generating three damages:
1) to b1 with R11, R21 and R31 damaged;
2) to b2 with R11, R21, R31 and R12, damaged;
3) to B/2 with R11, R21, R31, R12, R22 and R32 damaged.
A damage having a transverse extent b and a vertical extent H2 leads to the flooding of both wing
compartment and hold; for b and H1 only the wing compartment is flooded. The figure illustrates
a partial subdivision draught dp damage.
centreline
b2
= =
shell
Zone 1 Zone 2 Zone 3
R32
R31
R11
R12 R22
R21
= =
b1
b2
centreline
shell
Zone 1 Zone 2
= =
Zone 3
b3
R32
R31
R12 R22
R11
R21
b3
shell
centreline
Zone 1 Zone 2 Zone 3
R10 R20
R31
R32
b3
b3
b1
b1 b2 b3
SLF 51/WP.1
ANNEX 1
Page 22
I:\SLF\51\WP\1.doc
The same is valid if b-values are calculated for arrangements with sloped walls.Pipes and valves directly adjacent to a longitudinal bulkhead can be considered to be part of the bulkhead, provided the separation distance is of the same order as the bulkhead stiffening structure. The same applies for small recesses, drain wells, etc.
Regulation 7-2 – Calculation of the factor si
General
Initial condition – an intact loading condition to be considered in the damage analysis described by the mean draught, vertical centre of gravity and the trim. Or alternative parameters from where the same may be determined (ex. displacement, GM and trim). There are three initial conditions corresponding to the three draughts ds, dp and dl.
Immersion limits – immersion limits are an array of points that are not to be immersed at various stages of flooding as indicated in paragraphs 5.2 and 5.3 of the regulation.
Openings – all openings need to be defined: both weathertight and unprotected. Openings are the most critical factor to preventing an inaccurate index A. If the final waterline immerses the lower edge of any opening through which progressive flooding takes place, the factor “s” may be recalculated taking such flooding into account. However, in this case the s value should also be calculated without taking into account progressive flooding and corresponding opening. The smallest s value should be retained for the contribution to the attained index.
In cases where the GZ curve may include more than one “range” of positive righting levers for a specific stage of flooding, only one continuous positive “range” of the GZ curve may be used within the allowable range/heel limits for calculation purposes. Different stages of flooding may not be combined in a single GZ curve.
In figure 1, the s-factor may be calculated from the heel angle, range and corresponding GZmax of the first or second “range” of positive righting levers. In figure 2, only one s-factor can be calculated.
Intermediate stages of flooding
The case of instantaneous flooding in unrestricted spaces in way of the damage zone does not require intermediate stage flooding calculations. Where intermediate stages of flooding calculations are necessary in connection with progressive flooding, they should reflect the sequence of filling as well as filling level phases. Calculations for intermediate stages of flooding should be performed whenever equalization is not instantaneous, i.e. equalization is of a duration greater than 60 s. Such calculations consider the progress through one or more floodable (non-watertight) spaces. Bulkheads surrounding refrigerated spaces, incinerator rooms and longitudinal bulkheads fitted with non-watertight doors are typical examples of structures that may significantly slow down the equalization of main compartments.
Flooding boundaries
If a compartment contains decks, inner bulkheads, structural elements and doors of sufficient tightness and strength to seriously restrict the flow of water, for intermediate stage flooding calculation purposes it should be divided into corresponding non-watertight spaces. It is assumed that the non-watertight divisions considered in the calculations are limited to “A” class fire-rated bulkheads and do not apply to “B” class fire-rated bulkheads normally used in accommodation areas (e.g., cabins and corridors). This guidance also relates to regulation 4, paragraph 4.
Sequential flooding computation
For each damage scenario, the damage extent and location determine the initial stage of flooding. Calculations should be performed in stages, each stage comprising of at least two intermediate
filling phases in addition to the full phase per flooded space. Unrestricted spaces in way of damage should be considered as flooded immediately. Every subsequent stage involves all connected spaces being flooded simultaneously until an impermeable boundary or final equilibrium is reached. If due to the configuration of the subdivision in the ship it is expected
that other intermediate stages of flooding are more onerous, then those should be investigated.
Cross-flooding/equalization
In general, cross-flooding is meant as a flooding of an undamaged space on the other side of the ship to reduce the heel in the final equilibrium condition.
The cross-flooding time should be calculated in accordance with resolution MSC.245(83).If complete fluid equalization occurs in 60 s or less, it should be treated as instantaneous and no further calculations need to be carried out. Additionally, in cases where sfinal = 1 is achieved in 60 s or less, but equalization is not complete, instantaneous flooding may also be assumed
if sfinal will not become reduced. In any cases where complete fluid equalization exceeds 60 s, the value of sintermediate after 60 s is the first intermediate stage to be considered. Only passive open cross-flooding arrangements without valves should be considered effective for instantaneous flooding cases.
If complete fluid equalization can be finalized in 10 min or less, the assessment of survivability can be carried out for passenger ships as the smallest values of sintermediate or sfinal . In case the equalization time is longer than 10 min, sfinal is calculated for the floating position achieved after 10 min of equalization. This floating position is computed by calculating the
amount of flood water according to resolution MSC.245(83) using interpolation, where the equalization time is set to 10 min, i.e. the interpolation of the flood water volume is made between the case before equalization (T = 0) and the total calculated equalization time.
In any cases where complete fluid equalization exceeds 10 min, the value of sfinal used in theformula in paragraph 1.1 should be the minimum of sfinal at 10 min or at final equalization.
Cargo ships
If the Administration considers that the stability in intermediate stages of flooding in a cargo ship may be insufficient, it may require further investigation thereof.
The displacement is the intact displacement at the subdivision draught in question (ds, dp and dl).
The beam B used in this paragraph means breadth as defined in regulation 2.8.
The parameter A (projected lateral area) used in this paragraph does not refer to the attained subdivision index.
In cargo ships where cross flooding devices are fitted, the safety of the ship should be maintained in all stages of flooding. The Administration may request for this to be demonstrated. Cross-flooding equipment, if installed, should have the capacity to ensure that the equalization takes place within 10 min.
Unprotected openings
The flooding angle will be limited by immersion of such an opening. It is not necessary to define a criterion for non-immersion of unprotected openings at equilibrium, because if it is immersed, the range of positive GZ limited to flooding angle will be zero so “s” will be equal to zero.
An unprotected opening connects two rooms or one room and the outside. An unprotected opening will not be taken into account if the two connected rooms are flooded or none of these rooms are flooded. If the opening is connected to the outside, it will not be taken into account if the connected compartment is flooded. An unprotected opening does not need to be taken into account if it connects a flooded room or the outside to an undamaged room, if this room will be considered as flooded in a subsequent stage.
Openings fitted with a weathertight mean of closing (“weathertight openings”) The survival “s” factor will be “0” if any such point is submerged at a stage which is considered as “final”. Such points may be submerged during a stage or phase which is considered as“intermediate”, or within the range beyond equilibrium.
If an opening fitted with a weathertight means of closure is submerged at equilibrium during a stage considered as intermediate, it should be demonstrated that this weathertight means of closure can sustain the corresponding head of water and that the leakage rate is negligible.
These points are also defined as connecting two rooms or one room and the outside, and the same principle as for unprotected openings is applied to take them into account or not. If several stages have to be considered as “final”, a “weathertight opening” does not need to be taken into account if it connects a flooded room or the outside to an undamaged room if this room will be considered as flooded in a successive “final” stage.
Partial immersion of the bulkhead deck may be accepted at final equilibrium. The new provision is intended to ensure that evacuation along the bulkhead deck to the vertical escapes will not be impeded by water on that deck. A “horizontal evacuation route” in the context of this regulation means a route on the bulkhead deck connecting spaces located on and under this deck with the vertical escapes from the bulkhead deck required for compliance with SOLAS chapter II-2.
Horizontal evacuation routes on the bulkhead deck include only escape routes (designated as category 2 stairway spaces according to SOLAS regulation II-2/9.2.2.3 or as category 4 stairway spaces according to SOLAS regulation II-2/9.2.2.4 for passenger ships carrying not more than 36 passengers) used for the evacuation of undamaged spaces. Horizontal evacuation routes.
do not include corridors (designated as category 3 corridor spaces according to SOLAS regulation II-2/9.2.2.3 or as category 2 corridor spaces according to SOLAS regulation II-2/9.2.2.4 for passenger ships carrying not more than 36 passengers) within the damaged space. No part of a horizontal evacuation route serving undamaged spaces should be immersed.
si = 0 where it is not possible to access a stair leading up to the embarkation deck from an undamaged space as a result of flooding to the “stairway” or “horizontal stairway” on the
bulkhead deck.
Horizontal escapes situated in way of the damage extent may remain effective, therefore si need not be taken as zero. Contributions to the attained index A may still be gained.
The purpose of this paragraph is to provide an incentive to ensure that evacuation through a vertical escape will not be obstructed by water from above. The paragraph is intended for smaller emergency escapes, typically hatches, where fitting of a watertight or weathertight means of closure would otherwise exclude them from being considered as flooding points.
Since the probabilistic regulations do not require that the watertight bulkheads be carried continuously up to the bulkhead deck, care should be taken to ensure that evacuation from intact spaces through flooded spaces below the bulkhead deck will remain possible, for instance by means of a watertight trunk.
In this example, there are 3 horizontal subdivisions to be taken into account as the vertical extent of damage.The example shows the maximum possible vertical extent of damage d + 12.5 m is positioned between H2 and H3. H1 with factor v1, H2 with factor v2 > v1 but v2 < 1 and H3 with factor v3 = 1.
The factors v1 and v2 are the same as above. The reserve buoyancy above H3 should be taken undamaged in all damage cases.
The combination of damages into the rooms R1, R2 and R3 positioned below the initial water line should be chosen so that the damage with the lowest s-factor is taken into account. That often results in the definition of alternative damages to be calculated and compared.
If the deck taken as lower limit of damage is not watertight, down flooding should be considered.
The parameters x1 and x2 are the same as parameters x1 and x2 used in regulation 7-1.
Concerning the use of other figures for permeability “if substantiated by calculations”, such permeabilities should reflect the general conditions of the ship throughout its service life rather than specific loading conditions.
This paragraph allows for the recalculation of permeabilities. This should only be considered in cases where it is evident that there is a major discrepancy between the values shown in the regulation and the real values. It is not designed for improving the attained value of a deficient ship of regular type by the modification of chosen spaces in the ship that are known to provide
significantly onerous results. All proposals should be considered on a case-by-case basis by the Administration and should be justified with adequate calculations and arguments.
Regulation 8 – Special requirements concerning passenger ship stability
The number of persons carried, which is specified in these paragraphs, equals the total number of persons the ship is permitted to carry (and not N = N1 + 2 N2 as defined in regulation 6).
Regulation 8-1 – System capabilities after a flooding casualty on passenger ships
In the context of this regulation, “compartment” has the same meaning as defined under regulation 7-1 of these Explanatory Notes (i.e. an onboard space within watertight boundaries).The purpose of the paragraph is to prevent any flooding of limited extent from immobilizing the ship. This principle should be applied regardless of how the flooding might occur. Only
flooding below the bulkhead deck need be considered.
Regulation 9 – Double bottoms in passenger ships and cargo ships other than tankers
This regulation is intended to minimize the impact of flooding from a minor grounding. Special attention should be paid to the vulnerable area at the turn of the bilge. When justifying a deviation from fitting an inner bottom an assessment of the consequences of allowing a more extensive flooding than reflected in the regulation should be provided.
Except as provided in paragraphs 3 and 4, parts of the double bottom not extended for the full width of the ship as required by paragraph 1 should be considered an unusual arrangement for the purpose of this regulation and is to be handled in accordance with paragraph 7.
If an inner bottom is located higher than the partial subdivision draught dp, this should be considered an unusual arrangement and is to be handled in accordance with paragraph 7.
Any part of a passenger ship or a cargo ship where a double bottom is omitted in accordance with paragraph 1, 4 or 5 shall be capable of withstanding bottom damages, as specified in paragraph 8.
The intent of this provision is to specify the circumstances under which the Administration should require calculations, which damage extents to assume and what survival criteria to apply when double bottoms are not fitted.
The definition of “watertight” in regulation 2.17 implies that the strength of inner bottoms and other boundaries assumed to be watertight must be verified if they are to be considered effective in this context.
The reference to a “plane” in paragraph 2 does not imply that the surface of the inner bottom may not be stepped in the vertical direction. Minor steps and recesses need not be considered unusual arrangements for the purpose of this paragraph as long as no part of the inner bottom is located below the reference plane. Discontinuities in way of wing tanks are covered by paragraph 4.
The term “all service conditions” used in this paragraph means the three loading conditions used to calculate the attained subdivision index A.
The damage extents specified in this paragraph should be applied to all parts of the ship where no double bottom is fitted, as permitted by regulation 9.1, 9.4 or 9.5, and include any adjacent spaces located within the extent of damage. Small wells in accordance with regulation 9.3 do not need to be considered damaged even if within the extent of the damage. Possible positions of the damages are shown in an example below (parts of the ship not fitted with a double bottom are shaded; the damages to be assumed are indicated by boxes).
For the purpose of identifying “large lower holds”, horizontal surfaces having a continuous deck area greater than approximately 30% in comparison with the waterplane area at subdivision draught should be taken located anywhere in the affected area of the ship. For the alternative bottom damage calculation, a vertical extent of B/10 or 3 m, whichever is less, should be assumed.
The increased minimum double bottom height of not more than B/10 or 3 m, whichever is less, for passenger ships with large lower holds, is applicable to holds in direct contact with the double bottom. Typical arrangements of ro-ro passenger ships may include a large lower hold with additional tanks between the double bottom and the lower hold, as shown in the figure below.
In such cases, the vertical position of the double bottom required to be B/10 or 3 m, whichever is less, should be applied to the lower hold deck, maintaining the required double bottom height of B/20 or 2 m, whichever is less (but not less than 760 mm).
Typical arrangement of a modern ro-ro passenger ferry
Regulation 10 – Construction of watertight bulkheads
For the treatment of steps in the bulkhead deck of passenger ships see notes under regulation 13.For the treatment of steps in the freeboard deck of cargo ships see notes under regulation 13-1.Regulation 12 – Peak and machinery space bulkheads, shaft tunnels, etc.Reference is made to MSC.1/Circ.1211 concerning interpretations regarding bow doors and the extension of the collision bulkhead.
Regulation 13 – Openings in watertight bulkheads below the bulkhead deck in passenger ships
General – Steps in the bulkhead deck
If the transverse watertight bulkheads in a region of the ship are carried to a higher deck which forms a vertical step in the bulkhead deck, openings located in the bulkhead at the step may be considered as being located above the bulkhead deck. Such openings should then comply with regulation 17 and should be taken into account when applying regulation 7-2.
All openings in the shell plating below the upper deck throughout that region of the ship should be treated as being below the bulkhead deck and the provisions of regulation 15 should be applied.
Paragraph 4
In cases where main and auxiliary propulsion machinery spaces, including boilers serving the needs for propulsion, are divided by watertight longitudinal bulkheads in order to comply with redundancy requirements (e.g., according to regulation 8-1.2), one watertight door in each watertight bulkhead may be permitted, as shown in the figure below.
Regulation 13-1 – Openings in watertight bulkheads and internal decks in cargo ships
Paragraph 1
If the transverse watertight bulkheads in a region of the ship are carried to a higher deck than in the remainder of the ship, openings located in the bulkhead at the step may be considered as being located above the freeboard deck.
All openings in the shell plating below the upper deck throughout that region of the ship should be treated as being below the freeboard deck, similar to the bulkhead deck for passenger ships (see relevant figure under regulation 13 above), and the provisions of regulation 15 should be applied.
Regulation 15 – Openings in the shell plating below the bulkhead deck of passenger ships and the freeboard deck of cargo ships
General – Steps in the bulkhead deck and freeboard deck
For the treatment of steps in the bulkhead deck of passenger ships see notes under regulation 13.
For the treatment of steps in the freeboard deck of cargo ships see notes under regulation 13-1.
Regulation 15-1 – External openings in cargo ships
Paragraph 1
With regard to air-pipe closing devices, they should be considered weathertight closing devices (not watertight). This is consistent with their treatment in regulation 7-2.5.2.1. However, in the context of regulation 15-1, “external openings” are not intended to include air-pipe openings.
Regulation 16 – Construction and initial tests of watertight doors, sidescuttles, etc.
Paragraph 2
Watertight doors should be tested by water pressure to a head of water measured from the lower edge of the door opening to the bulkhead deck or the freeboard deck, or to the most unfavourable final or intermediate waterplane during flooding, whichever is greater. Large doors, hatches or ramps on passenger and cargo ships, of a design and size that would make pressure testing impracticable, may be exempted from regulation 16.2, provided it is demonstrated by calculations that the doors, hatches or ramps maintain watertightness at design pressure with a proper margin of resistance. Where such doors utilize gasket seals, a prototype pressure test to confirm that the compression of the gasket material is capable of accommodating any deflection, revealed by the structural analysis, should be carried out. After installation every such door, hatch or ramp should be tested by means of a hose test or equivalent.
Note: See notes under regulation 13 for additional information regarding the treatment of steps in the bulkhead deck of passenger ships. See notes under regulation 13-1 for additional information regarding the treatment of steps in the freeboard deck of cargo ships.
Regulation 17 – Internal watertight integrity of passenger ships above the bulkhead deck
General – Steps in the bulkhead deck
For the treatment of steps in the bulkhead deck of passenger ships see notes under regulation 13.
Paragraph 1
Watertight sliding doors with reduced pressure head complying with the requirements of MSC/Circ.541, as may be amended, should be in line with regulation 7-2.5.2.1. These types of tested watertight sliding doors with reduced pressure head could be immersed during intermediate stages of flooding.
Paragraph 3
These provisions regarding the open end of air pipes should be applied only to damages of longitudinal and transverse extent as defined in regulation 8.3 but limited to the bulkhead deck and involving tanks having their open end terminating within the superstructure.
GUIDELINES FOR THE PREPARATION OF SUBDIVISION AND DAMAGE STABILITY CALCULATIONS
1 GENERAL
1.1 Purpose of the Guidelines
1.1.1 These Guidelines serve the purpose of simplifying the process of the damage stability analysis, as experience has shown that a systematic and complete presentation of the particulars results in considerable saving of time during the approval process.
1.1.2 A damage stability analysis serves the purpose to provide proof of the damage stability standard required for the respective ship type. At present, two different calculation methods, the deterministic concept and the probabilistic concept are applied.
1.2 Scope of analysis and documentation on board
1.2.1 The scope of subdivision and damage stability analysis is determined by the required damage stability standard and aims at providing the ship’s master with clear intact stability requirements. In general, this is achieved by determining KG-respective GM-limit curves,containing the admissible stability values for the draught range to be covered.
1.2.2 Within the scope of the analysis thus defined, all potential or necessary damage conditions will be determined, taking into account the damage stability criteria, in order to obtain the required damage stability standard. Depending on the type and size of ship, this may involve a considerable amount of analyses.
1.2.3 Referring to SOLAS chapter II-1, regulation 19, the necessity to provide the crew withthe relevant information regarding the subdivision of the ship is expressed, therefore plans should be provided and permanently exhibited for the guidance of the officer in charge. These plans should clearly show for each deck and hold the boundaries of the watertight compartments, the openings therein with means of closure and position of any controls thereof, and the arrangements for the correction of any list due to flooding. In addition, Damage Control Booklets containing the aforementioned information should be available.
2 DOCUMENTS FOR SUBMISSION
2.1 Presentation of documents
The documentation should begin with the following details: principal dimensions, ship type,designation of intact conditions, designation of damage conditions and pertinent damaged compartments, KG-respective GM-limit curve.
2.2 General documents
For checking of the input data, the following should be submitted:
.1 main dimensions;
.2 lines plan, plotted or numerically;
.3 hydrostatic data and cross curves of stability (including drawing of the buoyant hull);
.4 definition of sub-compartments with moulded volumes, centres of gravity and permeability;
.5 layout plan (watertight integrity plan) for the sub-compartments with all internal and external opening points including their connected sub-compartments, and particulars used in measuring the spaces, such as general arrangement plan and
tank plan. The subdivision limits, longitudinal, transverse and vertical, should be included;
.6 light service condition;
.7 load line draught;
.8 coordinates of opening points with their level of tightness (e.g., weathertight,unprotected);
.9 watertight door location with pressure calculation;
.10 side contour and wind profile;
.11 cross and down flooding devices and the calculations thereof according to resolution MSC.245(83) with information about diameter, valves, pipes length and coordinates of inlet/outlet;
.12 pipes in damaged area when the destruction of these pipes results in progressive flooding; and
.13 damage extensions and definition of damage cases.
2.3 Special documents
The following documentation of results should be submitted.
2.3.1 Documentation
2.3.1.1 Initial data:
.1 subdivision length Ls;
.2 initial draughts and the corresponding GM-values;
.3 required subdivision index R; and
.4 attained subdivision index A with a summary table for all contributions for all
damaged zones.
2.3.1.2 Results for each damage case which contributes to the index A:
.1 draught, trim, heel, GM in damaged condition;
.2 dimension of the damage with probabilistic values p, v and r;
.3 righting lever curve (including GZmax and range) with factor of survivability s;
.4 critical weathertight and unprotected openings with their angle of immersion; and
.5 details of sub-compartments with amount of in-flooded water/lost buoyancy with
their centres of gravity.